Metro Station Box Excavation Dewatering

Reynolds & Bauhm was engaged on a station-box excavation and proposed a containerised silt-water treatment train with reuse for dust suppression, with documents and sizing provided.

48 hr
Deploy
Silt
Removed
Reuse
Dust Suppression

The Challenge

A cut-and-cover station box produced silty dewatering water on a congested city-centre site with no nearby discharge point and tight suspended-solids limits.

On a metro or tunnelling project, a water challenge of this kind translates straight into cost and programme risk — constrained sites, peaky dewatering flows, tight discharge limits and a heavy regulatory burden. The reliable route is to measure the actual water first, understand what is really driving the problem, and only then size the treatment. That diagnostic discipline is where Reynolds & Bauhm began this engagement.

The Proposed Solution

Reynolds & Bauhm was engaged as the consulting engineer. Working alongside the project team, we characterised the water and proposed a solution sized to the measured duty, with the supporting drawings, specification and calculations handed over. The recommended approach combined several coordinated measures:

  • Containerised settlement plus lamella / DAF clarification
  • Polymer dosing matched to the silt for rapid settling
  • Treated-water reuse for dust suppression and wheel-wash
  • Skip-based sludge handling suited to the constrained site

Advisory engagement

Reynolds & Bauhm acted in an advisory capacity — assessing the problem, proposing and sizing the solution and providing the documents and calculations. This is a representative scenario; figures are typical of the technology proposed and every project is validated against the project’s own data.

How the Solution Was Scoped

Each stage was selected against the water analysis and sized with a sensible design margin, then set out as a process flow diagram, functional design specification and sizing calculations for the project to take forward. Reynolds & Bauhm defined the duty, the equipment selection and the control philosophy, and identified the interface and consent risks to resolve before implementation — including a commissioning, sampling and validation plan so the plant could meet its targets and its discharge consent from start-up.

Expected Outcome

ParameterBeforeAfter (target)
Suspended solidshighto consent
Water reused0%dust suppression
Deploymentweeks48 hr

Beyond the headline figures, the proposed approach targets reliable discharge compliance on a constrained construction site and a treatment footprint that fits the works — the combination that keeps the tunnelling programme moving.

Why This Approach Works

Diagnose before designing

The proposed train is built around real water data, not an assumption — the single biggest determinant of whether a construction-water plant succeeds.

Right technology for the duty

Each stage earns its place against the measured load and the site footprint, avoiding both under-treatment and over-engineering.

Documented & calculated

Drawings, specifications and sizing calculations make the result provable, auditable and ready for the regulator.

Site-ready

The approach suits constrained, fast-moving tunnelling sites — compact, containerised and re-deployable.

Related Case Studies & Pages

Have a similar challenge?

Reynolds & Bauhm can assess feasibility and propose a validated, sized solution for your metro & tunnelling application, with the supporting documents and calculations. Send us your flow, ground/water data and target consent and we will scope it.

Industries We Serve

Our expertise spans multiple industries with sector-specific water treatment solutions.