Compact containerised wastewater pre-treatment plant for confectionery manufacturing.
CFD, P&ID, SCADA and commissioning for critical water treatment plants.
Plant layouts, piping isometrics and construction-ready engineering drawings.
Flow, mixing and thermal CFD across treatment and process equipment.
Full mechanical, physico-chemical, biological and sludge equipment range.
A confectionery manufacturer needed a compact wastewater treatment solution within limited space constraints. The wastewater contained high sugar content, colorants, and suspended solids from candy and chocolate production.
Fully pre-assembled containerised treatment plant for rapid deployment and minimal site work.
Compact DAF unit for removing suspended solids and colorants from confectionery wastewater.
Fine rotary drum screen to capture candy fragments and packaging debris.
Pre-wired and pre-piped system ready for immediate operation after delivery.
6-week installation from order to operation.
Compact footprint ideal for limited space.
Full compliance with discharge requirements.
Designed for simple operation and maintenance.
Food and beverage manufacturing generates high-strength wastewater containing organic matter, fats, oils, sugars, and suspended solids. Our treatment trains combine screening, dissolved air flotation for fat recovery, biological oxidation for dissolved organics, and tertiary polishing to meet discharge consent or enable water reuse. Each system is designed around your specific product mix and seasonal production variations.
Removes large solids and protects downstream pumps and biological systems from damage.
DAF systems recover valuable fats for rendering while reducing organic loading to biological stages.
Activated sludge, MBBR, or SBR processes remove dissolved sugars and organic compounds.
Tertiary filtration and UV enable safe recycling of process water for equipment washdown.
| COD Range | 1,000 – 10,000 mg/L (product dependent) |
| BOD Range | 500 – 5,000 mg/L |
| TSS Range | 200 – 3,000 mg/L |
| O&G Range | 50 – 800 mg/L |
| pH Range | 4.0 – 10.0 (cleaning cycle influence) |
| Temperature | 10 – 45°C (hot process water influence) |
| HRT Biological | 12 – 36 hours |
| Sludge Yield | 0.5 – 0.9 kg DS/kg COD removed |
HACCP-aligned design with food-grade materials and hygienic equipment selection.
Effluent engineered to meet trade effluent consent limits including BOD, TSS, and O&G.
Recovered protein, fat, and fibre fractions can offset treatment costs.
Contact us to discuss your wastewater treatment requirements.
Our expertise spans multiple industries with sector-specific water treatment solutions.