This is an illustrative scenario showing how Reynolds & Bauhm equipment can be configured for this application. Every site has unique requirements — contact us for a solution tailored to your specific wastewater characteristics.

Process Requirements & Constraints

Regional brewery producing 850 m3/day of process wastewater with COD 4,200 mg/L, BOD 2,800 mg/L, TSS 1,200 mg/L, and variable pH 4.5-9.5 due to CIP cycles. Effluent must meet sewer discharge standards of COD <500 mg/L and BOD <300 mg/L.

Key Performance Targets
92%
COD removal
340
Final COD mg/L
<30
TSS mg/L
18%
Cake solids
1.2
kWh/tonne
<500
Sewer COD limit met

Treatment Approach

Step-by-step process configuration from raw wastewater to compliant discharge.

01

Screening & Equalization

6 mm drum screen removes spent grain and packaging debris. Equalization tank with 16-hour retention balances flows and pH between production and CIP cycles.

02

DAF Pretreatment

DAF system with pressurised dissolved air flotation removes suspended solids, fats, and hop resins. Ferric chloride coagulant and anionic polymer achieve 85% TSS removal.

03

MBBR Biological Treatment

Two-stage MBBR with 65% fill ratio achieves 92% COD removal. Aeration at 4.5 mg/L DO. HRT 18 hours. Biofilm carriers handle variable organic loads without sludge bulking.

04

Secondary Clarification

Lamella clarifier separates biological sludge from MBBR effluent. Recycled activated sludge maintains biomass concentration. Clarified effluent TSS <30 mg/L.

05

Screw Press Dewatering

Multi-disc screw press thickens waste biological sludge from 1.2% to 18% solids. Low energy consumption at 1.2 kWh/tonne. Cake suitable for agricultural land application.

Equipment Configuration

The specific equipment selected for this application, sized for the flow rate and contaminant load.

DAF System

rectangular DAF, 45 m3/h capacity, 800 kPa saturation pressure, automated scraper and sludge pump.

View Equipment

MBBR Reactor

Two reactors 120 m3 each, HDPE biofilm carriers, fine bubble aeration, 92% COD removal design.

View Equipment

Lamella Clarifier

SS construction, 80 m2 settling area, integrated sludge hopper with RAS pumping.

View Equipment

Screw Press

Multi-disc screw press, 150 kgDS/h capacity, 18-22% cake solids, automated operation.

View Equipment

Performance Achieved

Representative performance data based on typical operating conditions for this equipment configuration.

92%
COD removal
340
Final COD mg/L
<30
TSS mg/L
18%
Cake solids
1.2
kWh/tonne
<500
Sewer COD limit met

Related Equipment

Explore the full range of equipment used in this and similar applications.

Drum Screen

6 mm screening of brewery wastewater to protect downstream equipment.

View Equipment

Chemical Dosing Skid

Coagulant and polymer preparation for DAF optimisation.

View Equipment

pH Correction System

Automated acid/alkali dosing for equalization tank pH control.

View Equipment

Fine Bubble Aeration

Efficient oxygen transfer for advanced biological treatment.

View Equipment

Related Treatment Processes

Discover how these treatment processes connect to form complete wastewater treatment solutions.

Project Approach & Engineering

Reynolds & Bauhm follows a structured engineering methodology for every project. We begin with detailed wastewater characterisation, process selection based on contaminant profiles, pilot testing where required, and full-scale design with performance guarantees. Our multidisciplinary team of chemical, mechanical, and electrical engineers ensures seamless integration of process, mechanical, and control disciplines.

Characterisation

Comprehensive influent analysis including COD, BOD, TSS, heavy metals, pH, temperature, and flow profiling.

Process Design

Process flow development with P&IDs, mass balances, and hydraulic modelling validated by CFD where appropriate.

Pilot Testing

On-site pilot trials validate performance guarantees under actual operating conditions before capital commitment.

Commissioning

FAT, SAT, performance trials, operator training, and handover documentation ensuring operational readiness.

Equipment Configuration

Pre-TreatmentScreening, grit removal, and flow equalisation
Primary TreatmentDAF or lamella clarification for solids and oil removal
Secondary TreatmentBiological oxidation (activated sludge, MBBR, or SBR)
Tertiary TreatmentFiltration, UV disinfection, or chemical polishing
Sludge ManagementThickening and dewatering via belt press or centrifuge
Control SystemPLC with HMI touchscreen and optional SCADA integration
Chemical DosingAutomated coagulant, flocculant, and pH correction
MaterialsSS316L, duplex, or rubber-lined carbon steel

Performance Outcomes

COD Removal

85 – 98% chemical oxygen demand reduction depending on process configuration and influent variability.

TSS Removal

90 – 99% suspended solids reduction through combined physical and biological treatment stages.

Water Reuse

Tertiary treatment enables up to 80% water recycling for non-potable process applications.

Apply This Configuration to Your Site

Our engineers will adapt this equipment configuration to your specific wastewater analysis, flow rate, and discharge requirements.

Industries We Serve

Our expertise spans multiple industries with sector-specific water treatment solutions.