Pilot Plant Design & Build

Custom-designed pilot plants from concept to commissioning. Mobile, skid-mounted and fixed configurations engineered for your specific wastewater treatment requirements.

Pilot Plant Design Process

From Concept to Commissioning in 6 Stages

1

Requirements Analysis

We analyse your wastewater characteristics, treatment objectives, site constraints, and regulatory requirements to define pilot plant scope and performance targets.

  • Flow, load, and contaminant profiling
  • Site survey and utility audit
  • Regulatory target mapping (discharge limits)
2

Process Design

Our engineers develop P&ID diagrams, equipment specifications, hydraulic profiles, and control philosophies tailored to your application.

  • Process flow diagrams (PFD) and P&IDs
  • Equipment sizing and duty calculations
  • Control narrative and alarm strategy
3

Fabrication

Pilot plants are fabricated in our production facilities using high-quality materials and certified welding procedures.

  • SS 304/316L construction with TIG welding
  • FRP tanks for corrosive applications
  • Pressure testing and weld inspection
  • Surface finish: 2B mill or pickled/passivated
4

Assembly & FAT

Factory Acceptance Testing verifies all mechanical, electrical, and control systems before shipment, ensuring reliable field performance.

  • Mechanical run-test (4–8 hours)
  • IO check and HMI functional test
  • Calibration certificate for instruments
  • FAT protocol signed off by client (optional)
5

Installation

Our technicians handle mechanical installation, utility connections, control integration, and startup procedures at your site or our test facility.

  • Mechanical bolting and levelling
  • Utility tie-in (power, water, air, drain)
  • Control panel commissioning
  • Safety interlock verification
6

Commissioning

We commission the pilot plant, optimise operating parameters, train your operators, and hand over complete documentation.

  • Process startup and parameter tuning
  • Operator training (theory + hands-on)
  • O&M manual and spare parts list
  • As-built P&IDs and datasheets

Mobile & Fixed Pilot Plants

Choose the Right Deployment Model for Your Application

Containerised Mobile Units

Fully integrated pilot plants housed in standard 20' or 40' CSC-certified shipping containers. Easy transport, minimal site preparation, and rapid deployment for on-site testing.

  • ISO 668 container standard
  • Plug-and-play utilities (power, water, drain)
  • HVAC climate control (−10°C to +45°C)
  • Best for: emergency response, site validation
View Mobile Unit Specifications
MOST POPULAR

Skid-Mounted Systems

Compact, modular skid-mounted pilot plants for indoor installations. Perfect for factory halls, existing buildings, or covered concrete pads with the highest flexibility.

  • Footprint: 6–24 m² depending on flow
  • Indoor or covered outdoor installation
  • Modular expansion (add treatment processes)
  • Best for: indoor validation, R&D centres
Request Skid-Mounted Quotation

Fixed Pilot Facilities

Permanent installations at our test centres or your site for extended testing programs. Ideal for complex process development and long-term validation.

  • Extended test durations (3–24 months)
  • Advanced analytical instrumentation
  • Full on-site laboratory support
  • Best for: long-term R&D, process optimisation
Discuss Fixed Facility Build

Typical Pilot Plant Specifications

Compare Configuration Options Side-by-Side

ParameterMobile ContainerisedSkid-Mounted Most PopularFixed Facility
Flow Rate Range1 – 20 m³/h0.5 – 50 m³/h5 – 200 m³/h
Deployment Time1 – 2 weeks2 – 4 weeks4 – 12 weeks
Footprint14–28 m² (container)6–24 m² (skid)Custom (building-based)
Power Supply400V 3-phase, 16–32 A400V 3-phase, 16–63 A400V 3-phase, 32–125 A
Materials of ConstructionSS 304/316L, FRPSS 304/316L, FRP, PPSS 304/316L, FRP, Duplex
Control SystemSiemens S7-1200 / Allen-Bradley CompactLogixSiemens S7-1500 / SCADA integrationSiemens S7-1500 / DCS / full SCADA
InstrumentationpH, DO, turbidity, flow, levelpH, DO, turbidity, flow, level, COD, TSS, conductivityFull lab + online + auto-sampling
Typical Duration2 weeks – 3 months1 – 6 months3 – 24 months
Best ForEmergency response · Site validationIndoor validation · R&DLong-term R&D · Process optimisation

Pilot Plant Technical Specifications

Equipment, Materials, Controls & Instrumentation

Treatment Technologies Available

We design pilot plants around the Treatment Process your application demands. Single-process or multi-stage configurations.

DAF · 1–20 m³/h
MBBR · 0.5–10 m³/h
SBR · 1–50 m³/h
Filtration · 1–20 m³/h
Lamella · 5–100 m³/h
UV Disinfection

Materials of Construction

Selected for compatibility with your wastewater chemistry, temperature, and abrasion profile.

SS 304/316L — General industrial, food-grade, dairy
SS 2205 Duplex — High chloride, marine, oil & gas
FRP (GRP) — Corrosive acids, pH < 3 or > 11
Polypropylene (PP) — Chemical resistance, low cost
PVC / uPVC — Pipework, dosing lines
PTFE-lined — Extreme chemical environments

Control & Automation

From standalone HMI panels to full SCADA integration with remote monitoring.

PLC: Siemens S7-1200/1500, Allen-Bradley CompactLogix, Schneider M241
HMI: 7–15" colour touchscreen, IP65 enclosure
Protocols: Modbus TCP/IP, PROFINET, EtherNet/IP
Remote: VPN gateway, cloud data logging (optional)
Safety: Emergency stops, door interlocks, leak detection

Instrumentation Package

Standard and advanced analytical instruments for real-time process monitoring and data logging.

pH, ORP, dissolved oxygen (DO)
Turbidity, suspended solids (TSS/MLSS)
Flow (electromagnetic, ultrasonic)
Level (ultrasonic, radar, hydrostatic)
Pressure, temperature, conductivity
Online COD, nutrient analysers (optional)
Auto-sampler with refrigerated storage

What's Included in Every Pilot Plant

Transparent Scope & Deliverables So You Know Exactly What You Get

Hardware & Equipment

  • All process equipment (tanks, pumps, reactors, filters)
  • Process pipework, valves, and fittings
  • Control panel with PLC and HMI
  • Instrumentation and cabling
  • Structural frame, skids, or container modification

Documentation & Drawings

  • P&ID and PFD (as-built)
  • Equipment datasheets and O&M manuals
  • Instrument list with tag numbers
  • Electrical drawings and IO lists
  • FAT protocol and test records

Training & Handover

  • Operator training (theory + hands-on, 1–2 days)
  • Maintenance training and spare parts list
  • Troubleshooting guide and emergency procedures
  • Remote support during first 30 days

What You Provide

  • Power: 400V 3-phase (16–125 A depending on size)
  • Raw water feed and potable water for cleaning
  • Compressed air (6 bar) if required for instrumentation
  • Effluent drainage / sludge disposal route
  • Hardstanding or concrete pad (mobile/skid units)

Deployment & Site Requirements

What to Expect When Your Pilot Plant Arrives

Shipping & Logistics

Mobile units ship as standard ISO containers (CSC-certified) via road, rail, or sea. Skid-mounted systems travel on flatbed trucks with lifting eyes for crane offloading.

  • Worldwide shipping (UK, EU, Middle East, Africa)
  • Export packing and customs documentation
  • Lifting plan and rigging diagram provided
  • Typical delivery: 4–8 weeks from order (mobile)

Site Preparation

Minimal preparation is required for mobile and skid units. Reynolds & Bauhm provides a site preparation checklist before delivery.

  • Level concrete pad or compacted hardstanding
  • Power supply within 10 m of unit
  • Feed water and drain connections
  • Overhead crane or forklift for offloading
  • Access for 40′ lorry and mobile crane

Climate & Environment

Optional HVAC, insulation, and weatherproofing packages ensure reliable operation from arctic to desert conditions.

  • Standard range: −10°C to +45°C ambient
  • Arctic package: −40°C with trace heating
  • Desert package: +55°C with oversized cooling
  • IP55 / IP65 electrical enclosures

Regional Deployment

We deploy pilot plants from our UK, Netherlands, Poland, and Germany facilities to minimise transport time and customs friction.

  • UK & Ireland: 1–2 weeks (road)
  • EU mainland: 3–7 days (road)
  • Middle East / Africa: 2–4 weeks (sea/air)
  • CE marking and ATEX compliance available

Related Services & Resources

Complete Your Project with Complementary Our Engineering Services

Related Pages

Daf Unit

Dissolved air flotation units for demanding industrial wastewater applications.

View Page

Pilot Best Practices

Best practices for wastewater pilot testing.

View Page

Pilot Custom Test Rigs

Custom test rigs and specialised pilot equipment for proprietary-technology validation, unique processes and one-off treatment challenges.

View Page

Pilot Data Analysis

Professional analysis of pilot test data.

View Page

Pilot Equipment Testing

Equipment performance testing and validation under real-world conditions.

View Page

Pilot Mobile Fixed

Compare mobile containerised pilots with fixed installations.

View Page

Planning a Pilot Program?

Download our Pilot Plant Design Checklist to prepare your site, define test objectives, and understand equipment requirements. Or request a feasibility consultation and we'll scope a custom pilot plant for your application.

Already have pilot data? See our scale-up methodology →