UK HQ Your time
Example ApplicationMunicipal Wastewater

Small Community WWTP Upgrade

This is an illustrative scenario showing how Reynolds & Bauhm equipment can be configured for this application. Every site has unique requirements — contact us for a solution tailored to your specific wastewater characteristics.

Process Requirements & Constraints

Village wastewater treatment plant serving 500 PE with failing oxidation ditch, frequent sludge bulking, and effluent BOD averaging 45 mg/L against a discharge consent of 25 mg/L. Available footprint limited to 6m x 12m. Requires upgrade to 1,000 PE capacity for new housing development.

Key Performance Targets
<10
BOD mg/L
<5
TSS mg/L
<2
Ammonia mg/L
1,000
PE capacity
6x12m
Footprint
24/7
Remote monitored

Treatment Approach

Step-by-step process configuration from raw wastewater to compliant discharge.

01

Process Assessment

Existing oxidation ditch capacity and performance audited. Sludge volume index measurements confirmed severe bulking (SVI 380 mL/g). Effluent quality data reviewed against consent conditions.

02

Containerised MBR Design

Two-container MBR plant designed: biological container with anoxic/aerobic chambers and membrane tank; process container with screens, blowers, dosing, and control. Total footprint 6m x 12m.

03

Membrane Bioreactor

Submerged flat-sheet membranes with 0.04 micron pore size. MLSS maintained at 10-12 g/L. Automatic membrane relaxation and chemically enhanced backwash (CEB) every 24 hours.

04

SCADA & Remote Monitoring

Full SCADA system with HMI touchscreen, remote access via VPN, SMS alarms, automatic data logging for regulatory reporting. Unattended operation capability.

05

Effluent Compliance

MBR effluent consistently achieves BOD <10 mg/L, TSS <5 mg/L, ammonia <2 mg/L. Meets EU Urban Waste Water Directive for stream discharge. Capacity upgrade to 1,000 PE achieved.

Equipment Configuration

The specific equipment selected for this application, sized for the flow rate and contaminant load.

Containerised MBR

Two 40ft containers, flat-sheet membranes, 150 m3/day capacity, anoxic/aerobic/MBR process train.

View Equipment

SCADA Panel

Siemens S7-1200 PLC, 10-inch HMI, remote VPN access, SMS alarm module, data historian.

View Equipment

Fine Screen

3 mm perforated screen, 30 m3/h capacity, automatic brush cleaning, compact MCC integration.

View Equipment

Blower Package

Two rotary lobe blowers 5.5 kW each, variable speed drive, duty/standby, acoustic enclosure.

View Equipment

Performance Achieved

Representative performance data based on typical operating conditions for this equipment configuration.

<10
BOD mg/L
<5
TSS mg/L
<2
Ammonia mg/L
1,000
PE capacity
6x12m
Footprint
24/7
Remote monitored

Related Equipment

Explore the full range of equipment used in this and similar applications.

pH Correction System

Caustic soda dosing for occasional pH adjustment in biological tank.

View Equipment

UV Disinfection

UV-C reactor for pathogen inactivation before stream discharge.

View Equipment

Sludge Dewatering

Screw press for waste sludge from MBR process.

View Equipment

Level Sensors

Ultrasonic level control for pump stations and tanks.

View Equipment

Related Treatment Processes

Discover how these treatment processes connect to form complete wastewater treatment solutions.

Project Approach & Engineering

Reynolds & Bauhm follows a structured engineering methodology for every project. We begin with detailed wastewater characterisation, process selection based on contaminant profiles, pilot testing where required, and full-scale design with performance guarantees. Our multidisciplinary team of chemical, mechanical, and electrical engineers ensures seamless integration of process, mechanical, and control disciplines.

Characterisation

Comprehensive influent analysis including COD, BOD, TSS, heavy metals, pH, temperature, and flow profiling.

Process Design

Process flow development with P&IDs, mass balances, and hydraulic modelling validated by CFD where appropriate.

Pilot Testing

On-site pilot trials validate performance guarantees under actual operating conditions before capital commitment.

Commissioning

FAT, SAT, performance trials, operator training, and handover documentation ensuring operational readiness.

Equipment Configuration

Pre-TreatmentScreening, grit removal, and flow equalisation
Primary TreatmentDAF or lamella clarification for solids and oil removal
Secondary TreatmentBiological oxidation (activated sludge, MBBR, or SBR)
Tertiary TreatmentFiltration, UV disinfection, or chemical polishing
Sludge ManagementThickening and dewatering via belt press or centrifuge
Control SystemPLC with HMI touchscreen and optional SCADA integration
Chemical DosingAutomated coagulant, flocculant, and pH correction
MaterialsSS316L, duplex, or rubber-lined carbon steel

Performance Outcomes

COD Removal

85 – 98% chemical oxygen demand reduction depending on process configuration and influent variability.

TSS Removal

90 – 99% suspended solids reduction through combined physical and biological treatment stages.

Water Reuse

Tertiary treatment enables up to 80% water recycling for non-potable process applications.

Apply This Configuration to Your Site

Our engineers will adapt this equipment configuration to your specific wastewater analysis, flow rate, and discharge requirements.

Industries We Serve